Steel Factory Building Extension - Shimizu


19000 Square Foot Factory Extension In Just 56 Days From First Inquiry To Final Handover

When Shimizu, a Japanese motor component manufacturer were looking to consolidate, they decided to invest in a 19000 square foot building extension to their existing factory, as opposed to renewing the lease on a building they had rented in a town, 15 miles away.

Timing was critical though, because with the lease ending, and with them not wanting to sign an extension to their lease, they not only needed a rapid solution, but one which would stand the test of time too.

Which is why they opted for a bespoke permanent extension from our construction division.

Interestingly, they originally inquired about our re-locatable temporary buildings because timing was critical and speed, of the essence, but we were able to supply them with a permanent extension in the same time-frame, which gave them the best all round solution.

Due to the sheer span of the extension - 45 metres - we supplied the extension with internal hot rolled columns to provide the strength for the overall span, and were able to 'flash' the new extension to their existing building to create a direct link from one to the other.

The entire process (excluding the base) took just 56 days from 1st call to final handover, which was a feat, even by our standards!

Building Dimensions: 40mtr x 25mtr x 5mtr side height

Cladding: To building regulation L2 standard incorporating 60mm wall cladding and 80mm roof cladding

Access: 2 x 4mtr x 5mtr 3phase electric roller shutter doors with 5 x lockable personnel doors


BUILDING OPTIONS

Roof:

Walls:

Flooring:

Extras:

Steel roof 80mm

Steel wall 60mm

none

Full colour range

Windows:

Doors:

Lights:

none

Electric roller door

none

“Solve all of your business space needs for weeks, months or years... in days.
 

FREE REPORTS AREA

Request Planning Report
FREE
Request Planning Report
FREE
Request Temporary Buildings Guide
Request Temporary Buildings Guide
Request Permanent Building Guide
FREE
Request Permanent Building Guide

BUILDING UPDATES

Keep up to date with everything that could affect your project






TESTIMONIALS

Kia Motors

Glasgow

Kia Motors (UK) Ltd and Phoenix both wanted to have a Kia dealer in Glasgow.

A traditional build was c£300k minimum. Given that Phoenix may have to surrender the lease on the site and relocate within 3 years, writing off £300k over 3 years was not a viable option.

We researched the mark...

- Ian Wilson

National Franchise Manager

POINTS OF VIEW

A Steel Building In 9 Days

8-Mar-12

Built in just 9 days

Something To Consider

23-Feb-12

Steel Buildings - Something To Consider

Temporary Buildings Feedback

8-Dec-11

Real customer feedback - not quite perfect but nearly