Production Building - Bespoke Steel Construction


Large Production Building

Augustus Martin originally approached us with a view to long-term hire or purchase of a re-locatable temporary building.

They were originally planning to have a building installed on their existing tarmac base, but given they planned to use the building as a production area, they realized they would need a level concrete base for their printing machinery to function correctly.

When they decided to go down the route of having a concrete base installed, they decided to go with the HYBRID building to benefit from the added insulation and all the benefits of natural light, from the skylight roof panels.


BUILDING OPTIONS

Roof:

Walls:

Flooring:

Extras:

Steel roof 80mm

Steel wall 60mm

Must stand on concrete floor

Skylights for natural daylight

Windows:

Doors:

Lights:

none

Electric roller door

none

“Solve all of your business space needs for weeks, months or years... in days.
 

FREE REPORTS AREA

Request Planning Report
FREE
Request Planning Report
FREE
Request Temporary Buildings Guide
Request Temporary Buildings Guide
Request Permanent Building Guide
FREE
Request Permanent Building Guide

BUILDING UPDATES

Keep up to date with everything that could affect your project






TESTIMONIALS

Canopy Extension

I'd like to take this opportunity to say how impressed we have been with the services you have provided us from the planning stage of the project, fabrication, through to installation.

Nothing has been to much trouble for your team.

The building itself gives us that valuable extra space we were looking for and looks ...

- confidential

POINTS OF VIEW

A Steel Building In 9 Days

8-Mar-12

Built in just 9 days

Something To Consider

23-Feb-12

Steel Buildings - Something To Consider

Temporary Buildings Feedback

8-Dec-11

Real customer feedback - not quite perfect but nearly