Hire Additional On-Site Temporary Storage Building


Additional On-site Temporary Storage Building

This Suffolk based transport company were running out of warehousing space due to a growing contract.

Temporary Storage Building
Bolted directly to concrete surface with
no ground preparation needed

Temporary Storage Building
Supplied with integral connecting
PVC gutter system

 

They opted to hire two temporary buildings which were linked by an integral gutter system, which has provided them with additional 1500square metres of warehousing space in which to store their clients' products ahead of distribution.

Before ordering, they visited our premises to view our range of display buildings and meet our design and planning team, after which, they instructed us to handle the entire planning permission process on their behalf.

This particular planning permission application took 19 weeks from initial application to formal approval, and was handled entirely by Ross, on their behalf.

Temporary Storage Building
Overall internal space of 15000sq
with 4mtr x 5mtr roller door fitted
to each building

Size:

17.5m wide x 50m long x 4.4m side-height linked to 12.5mtr x 50mtr long x 4.4m side-height

Specification:

Grey fabric ‘thermo-insulated’ roof with goose wing grey steel walls with 38mm insulation

 


BUILDING OPTIONS

Roof:

Walls:

Flooring:

Extras:

Thermo-insulated roof

38mm insulated sandwich panel

none

none

Windows:

Doors:

Lights:

none

Electric roller door

400w sodium spotlights

“Solve all of your business space needs for weeks, months or years... in days.
 

FREE REPORTS AREA

Request Planning Report
FREE
Request Planning Report
FREE
Request Temporary Buildings Guide
Request Temporary Buildings Guide
Request Permanent Building Guide
FREE
Request Permanent Building Guide

BUILDING UPDATES

Keep up to date with everything that could affect your project






TESTIMONIALS

Dovehouse Motors

Rushden

We required additional storage space for our expanding business and from planning through to completion Smart Space provided us with a fast, efficient and professional service.

The work was carried out with the minimum of disruption on site and any small issues encountered on the way were dealt with promptly and competently.

With t...

- Julie Lockwood

POINTS OF VIEW

A Steel Building In 9 Days

8-Mar-12

Built in just 9 days

Something To Consider

23-Feb-12

Steel Buildings - Something To Consider

Temporary Buildings Feedback

8-Dec-11

Real customer feedback - not quite perfect but nearly